CAT / CAS / ENG / FRA   

Fields of Application / Civil engineering

Barcelona. The Institut Municipal de Mercats sought to conduct a thorough inspection of any possible distortions affecting the structure of the Sant Antoni station on Line 2 of the Barcelona Metropolitan Railway - Ferrocarrils Metropolitans de Barcelona (FMB) that could have been caused to the road above by the provisional relocation of Sant Antoni Market.

 

Toyser introduced a series of topographical control points, as well as references points (prisms), located outside the area affected by the work. Toyser provided the high precision equipment and the technical staff required for the project.

Customer

  • Municipal Institute of Markets of Barcelone

Category

  • Services
  • Topography
  • Aplication Field
  • Civil engineering

Date

Related links

Related projects